GSA Comments on ECC Deliverable CEPT Report 74
“Draft Report from CEPT to the European Commission in response to the Mandate on spectrum for the future railway mobile communications system – Report A: Spectrum needs and feasibility (tasks 1 to 4)”
These comments were delivered to ECC on 23rd April 2020.
Annex to the Report
4G-5G FWA Forum’s Contribution to EU State Aid Guidelines ConsultationExecutive Summary GSA 4G-5G Fixed Wireless Access (FWA) Forum represents a…
GSA Comments on ECC Deliverable CEPT Report 74 “Draft Report from CEPT to the European Commission in response to the…
GSA Comments on ECC Deliverable Report 318 “Compatibility between RMR and MFCN in the 900 MHz range, the 1900-1920 MHz…